Case Study

Falcon Street

Falcon street was an REO we picked up from an agent who represented us on the purchase of the property.

Purchase Date: Purchased 7/28/10
Sales Date:
Purchase Price: $427,000
Bed / Bath: 2/2
Total Square Ft: 952
Price Per Square Foot: $604
Sales Price: $705,000
Holding Period:
Construction Costs:
Property Type: Residential, Detached
Year Built: 1962
Community: Mission Hills

Falcon Ave Project PRIVACY AND INCREDIBLE CANYON VIEWS!

This gorgeous home is “like-new” again with all systems new – elect. , plumbing, heating. This 2 Bed / 2 Bath, 952 sf home has new EVERYTHING! Gourmet kitchen with granite and stainless steel. Glass “subway tile” backsplash. Incredible views from two full decks – one on each level puts you on top of the world where you can be at peace. New flooring, paint, and baths. Master Suite has own deck and modern full bath with big walk-in shower. Gated storage area to R of garage. Small dog run. Permits and Insp.

4312 Falcon Street San Diego, CA 92103

Construction Complete

This purchase was an REO that was brought to us by an agent we had bought a few deals from. It is located in the very good neighborhood of Mission Hills near San Diego, California.

The hair on this deal is that the City had put a lien on the property due to numerous code violations.

Before we bought the property we met with the City to assess what had to be done and bought it. Well after a bureaucratic nightmare it took us from September until the end of December to get through plan check

Construction Complete
4312 Falcon Street
San Diego, CA 92103

 

 

 

Garage

We did the garage in white stucco – keeping it simple with a nice dark gray cement.

Living Room

Hand scraped/distressed dark walnut floors in living room and at bottom of the steps

Custom Storage

To the right of the garage I decided to add cement and will also add a gate to the front and a door from the garage so the new owner will have more storage and can put things like trash cans, bikes, misc. outside and secure.

Bathroom

A vessel sink will sit on top of granite.

Walkway

To break up all the cement everywhere I decided to create stepping stones out of the cement and aggregate to go in between.

Various stages of construction

The Falcon Blog

Updates on progress of the Falcon

Passed our nailing inspection on falcon

Hit another milestone today by passing our nailing and insulation inspection and have a crew working on taping and texturing the drywall and putting stucco at the garage. I am making my finish materials order today so we can start installing later this week. Here is...

ALMOST THERE!!!!

Well we only have one more inspection to go and the place is looking great. Cabinets are in tile is in color coat of stucco and cement this week beginning of next. Send pictures soon. Driving the comps...

Aaaaaaaalmost done with falcon flip!

Here are the latest pictures from last week - weve been very busy and have not been able to post everything I would like to. This week we should have   Granite Painting Cement  ADD VIDEO HERE I have not had the chance to upload the videos on the comps in the area but...

Garage Almost Complete

Here is a video of the Brand New Garage at Falcon. Just need to have it painted. Look for this gem to hit the market soon!!!!!!!!!!